The short answer

Interview two or three builders with the same questions and compare the answers side by side. The questions that separate builders are rarely about finishes: how the price is built, what is fixed and what is an allowance, what is excluded, how changes are handled, who runs the job, and how warranty service works. Check the license on the state board’s site, and read both its classification and its limitation.

The comparison worksheet

Ask every builder the same questions. Print this, or copy it into a spreadsheet, and fill in a column for each builder.

Topic What to ask A useful answer looks like Builder A Builder B
Scope What exactly is included, and in what document? A written scope tied to specific plan sheets and specifications, not a summary paragraph
Allowances Which items are allowances, and how were the amounts set? A line-by-line list, with amounts based on finishes you have discussed, and what happens to unused amounts
Exclusions What is not included? A written list: for example site conditions, utilities, landscaping, permits or design fees, whichever apply
Price method How do you get from the drawings to a number? Priced from the plans and scope, with the point at which the price becomes fixed stated plainly
Change orders How are changes priced and approved? In writing, with cost and schedule effect, approved before the work is done
Supervision Who runs my job day to day, and who is on site? Named people, how often they are on site, and how you reach them
Schedule How long, from when, and what most often delays it? A range from groundbreaking, with what happens before it explained separately
References Can I speak with recent clients with similar homes? Names of recent clients, and addresses you can drive by where clients agree
Insurance documentation Can you provide certificates of insurance? Current certificates issued by the insurer or agent, naming the company you are contracting with
License What is your license number, classification, limitation and qualifier? Numbers you can confirm yourself on the state board’s search
Warranty service What is covered, for how long, and how do I request service? Written terms, the request process, and who responds

Reading a North Carolina license correctly

A North Carolina general contractor license has two parts:

  • Classification is the type of work. Building, Residential, Highway, Public Utilities and Specialty are the main classifications. Building covers residential construction along with commercial and other buildings.
  • Limitation is the dollar size of a single project. A Limited license allows single projects up to $750,000, Intermediate up to $1,500,000, and Unlimited has no restriction on the value of a single project.

A company is licensed through a qualifier, the person who passed the examination for it. (NCLBGC, Classifications and Limitations; N.C. Gen. Stat. § 87-10)

What to check on the board’s license search:

  • The license is active
  • It is held by the company named on your contract
  • The classification covers the work
  • The limitation covers the value of your project
  • Who the qualifier is

Artistic Contractors holds North Carolina general contractor license #70053: the classification is Building, the limitation is Unlimited, and Daron Gaon is the qualifier.

Comparable work, and the builder’s role on it

Lake Norman Modern Retreat, a modern custom home in Denver, NC
Lake Norman Modern Retreat, Denver, NC: designed by McClellan Architects of Seattle and built by Artistic Contractors.

Ask to see homes similar to yours in size, style, site and complexity, and ask what the builder’s role was on each. The roles are different jobs:

Role Example from our work
Designed and built Tidewater, Lake Tillery: drawn by Daron Gaon and built by Artistic Contractors
Built with an outside architect Lake Norman Modern Retreat, designed by McClellan Architects of Seattle and built by Artistic Contractors
Major renovation from an architect’s plans The Contemporary Overhaul, Cotswold, with Cox Architecture & Design

You can see more on our work.

How we answer the worksheet

  • Price method: we build the budget and written scope from the plans, measuring the drawings and pricing the home as designed. Core scopes such as foundation, framing, structure and HVAC are priced and locked before the build begins. The Fixed Final Price is set once engineered plans, scope and allowances are complete. See the cost guide.
  • Supervision: owners Daron Gaon and Andrew Parker stay directly involved in each project. Meet them on our team.
  • Schedule: most of our homes take about 12 to 18 months from groundbreaking. See the timeline guide.
  • Warranty: every new home includes our one-year builder’s warranty, and optional 2-10 coverage is available at additional, separately quoted cost. See the warranty page.
  • Design: design-build with our in-house team, or building from your architect’s plans.
  • References and reviews: read what clients say on reviews, and ask us for references.
Interviewing builders?

We are glad to be one of the builders you compare. Bring the plans, the lot or just the questions.

Bring Us Your Worksheet →

Red flags worth a second question

  • A price far below the others, built from square-foot averages or incomplete plans
  • Allowances that are low for the finishes you have described
  • No written exclusions
  • Changes handled verbally
  • A schedule much shorter than everyone else’s, with no explanation
  • A license that does not match the company name on the contract

Frequently asked questions

How many builders should I interview?

Most clients talk with two or three. The goal is to compare how each one thinks about your project, not only the price.

Should I choose the lowest bid?

Not on price alone. Compare scope, allowances and exclusions first. A lower number built on incomplete plans or thin allowances often grows.

What is the difference between Building and Residential classifications?

Both can build homes. Residential covers homes built under the residential code; Building also covers commercial and other buildings. Check the classification and the limitation together.

When should I bring a builder in?

Early, ideally before or during design, so pricing and buildability inform the plans.

Sources